Hi
we are currently using JBPM version 3.2 in our porject.
I would like to know steps to migrate the existing workflows to be used by jbpm 6.
Also, please help me out by letting me know the ways I can perform this migration activity with minimum code change if possible?
Good luck, this could be a frustrating thing
As for DB-Migration, have a look here:
https://github.com/droolsjbpm/jbpm/tree/master/jbpm-installer/db/upgrade-scripts