Hello @ all,
we have an application running with Jboss ejb3 configuration. The Database is Oracle 10g. On jboss startup (or application deployment) we load an amount of data from the database with entity-manager and ejb3-entity-beans in mbean.
We used to run our application with jboss 4.0.4RC1 where load time was about 20 minutes. Now we switched to 4.0.5-GA and the starttime has doubled to about 40 minutes. The performance of the application itself seems to be unchanged.
additional information:
The Server is running under Windows Xp, Windows 2003 and Suse Linux Enterprise Server 9. The loading performance is the same on all systems.
Hope anyone can help
kind regards
kristina