This content has been marked as final. 
    
Show                 1 reply
    
- 
        1. Re: JBoss BIRT Integration from update sitenickboldt Mar 10, 2009 3:05 PM (in response to kkoster)I believe we already have; you just need a newer update. Try a nightly build from post-CR2 here, which build using Eclipse 3.4.2 rather than a pre-3.4.2 maintenance build: 
 http://download.jboss.org/jbosstools/updates/nightly/3.0.x/
 
    