1. Re: JIRA picture of MC work for JBossAS5 beta3
adrian.brock Jul 20, 2007 1:08 PM (in response to adrian.brock)"adrian@jboss.org" wrote:
I also don't understand why JBoss5 beta3 is linking tasks from
JBossMC 2RC1?
For some reason JBossMC 2.0beta2 was released as 2.0beta3? :-)
The idea was that the MC and AS would remain at the same release levels,
i.e. we do a JBossMC 2.0 beta3 for JBoss5 beta3
Since this is unfixable now (the releases are gone) one thing we
do need to do is move all the completed RC1 work into a beta4 release
along with the critical work I mentioned above (or are otherwise marked
critical) as outstanding tasks.
The other none critical outstanding tasks in RC1 can be left there.
They are just improvements to the implementation and more testing
that we'd like to get done in the 2.0 release. -
2. Re: JIRA picture of MC work for JBossAS5 beta3
adrian.brock Jul 20, 2007 1:27 PM (in response to adrian.brock)On a related issue, there are a number of closed items in JIRA
that don't have a "fixed version"
http://jira.jboss.com/jira/secure/IssueNavigator.jspa?reset=true&pid=12310060&status=6
These need correcting so they appear in the change log against the correct version. -
3. Re: JIRA picture of MC work for JBossAS5 beta3
adrian.brock Jul 20, 2007 1:51 PM (in response to adrian.brock)I've created a JBossMC 2.0 beta4 release
and assigned all the critical work other stuff that needs doing to it.
Currently the outstanding work is:
http://jira.jboss.com/jira/secure/IssueNavigator.jspa?reset=true&mode=hide&sorter/order=DESC&sorter/field=priority&resolution=-1&pid=12310060&fixfor=12310391
The other stuff is in the RC1
http://jira.jboss.com/jira/secure/IssueNavigator.jspa?reset=true&mode=hide&sorter/order=DESC&sorter/field=priority&resolution=-1&pid=12310060&fixfor=12311604
but if stuff gets finished before beta4 is released then just reassign the fix version.
I don't see why the javassist stuff is appearing in the RC1 release?
That is low priority work that probably shouldn't even be assigned to a release. -
4. Re: JIRA picture of MC work for JBossAS5 beta3
adrian.brock Jul 20, 2007 2:07 PM (in response to adrian.brock)"adrian@jboss.org" wrote:
I don't see why the javassist stuff is appearing in the RC1 release?
That is low priority work that probably shouldn't even be assigned to a release.
I've unscheduled this work.