-
1. Re: dynamic deadlines on tasks ?
kukeltje Jun 10, 2008 11:42 AM (in response to lblaauw)yes, wait for 3.2.3 which will be released shortly... there you can use EL to reference e.g. a processvariable that can be used for duedates. You can also do some math there like #{procVar + 3 days}
-
2. Re: dynamic deadlines on tasks ?
lblaauw Jun 10, 2008 1:37 PM (in response to lblaauw)Ronald,
That would be great and just what we need ;-) Any rough estimates on when 3.2.3 will be arriving ? I tried to upgrade our 3.2.2. with a build from the repository and it was labeled 3.2.3 but ran into some problems...
Regards,
Leo"kukeltje" wrote:
yes, wait for 3.2.3 which will be released shortly... there you can use EL to reference e.g. a processvariable that can be used for duedates. You can also do some math there like #{procVar + 3 days} -
3. Re: dynamic deadlines on tasks ?
kukeltje Jun 10, 2008 2:29 PM (in response to lblaauw)soon... less then a month 1 expect, maybe a lot less
I tried to upgrade our 3.2.2. with a build from the repository and it was labeled 3.2.3 but ran into some problems...
please elaborate, so we can maybe prevent some things -
4. Re: dynamic deadlines on tasks ?
lblaauw Jun 10, 2008 4:35 PM (in response to lblaauw)Well,
One of the things I had a problem with was the fact that now jpb config needs to be set into a system variable for it to work I guess. Is that intended ? It seems to resolve itselves automatically on the classpath in the jars or firstfound in 3.2.2 ?
I had this traced down originally but switched back to 3.2.2 since that worked fine.
I will give 3.2.3 another shot tomorrow since it seems to me that the EL deadline stuff is in the repository currently.
Regards,
Leo"kukeltje" wrote:
soon... less then a month 1 expect, maybe a lot lessI tried to upgrade our 3.2.2. with a build from the repository and it was labeled 3.2.3 but ran into some problems...
please elaborate, so we can maybe prevent some things -
5. Re: dynamic deadlines on tasks ?
lblaauw Jun 11, 2008 4:09 AM (in response to lblaauw)Ronald,
After I did an update from the repository today and redeployed with the jpdl 3.2.3 jar it seems all AoK at this time ;-) So I will try to implement some dynamic deadline in our processes and see how we fare with that.
Greetings,
Leo"lblaauw" wrote:
Well,
One of the things I had a problem with was the fact that now jpb config needs to be set into a system variable for it to work I guess. Is that intended ? It seems to resolve itselves automatically on the classpath in the jars or firstfound in 3.2.2 ?
I had this traced down originally but switched back to 3.2.2 since that worked fine.
I will give 3.2.3 another shot tomorrow since it seems to me that the EL deadline stuff is in the repository currently.
Regards,
Leo"kukeltje" wrote:
soon... less then a month 1 expect, maybe a lot lessI tried to upgrade our 3.2.2. with a build from the repository and it was labeled 3.2.3 but ran into some problems...
please elaborate, so we can maybe prevent some things -
6. Re: dynamic deadlines on tasks ?
memius Aug 22, 2008 11:29 AM (in response to lblaauw)Where can I found more information about the use of expressions ?
I am myself interested in retrieving the due date from a process variable, but I didn't find any syntactic help (yet ?)
Sincerely,
Dieter D'haeyere -
7. Re: dynamic deadlines on tasks ?
kukeltje Aug 25, 2008 7:11 AM (in response to lblaauw)uhhmm... the docs?