Is there a way we can add a setting for this as well(changeParentIfChildChanges=true)? If not, is there a way we can add a patch here to allow this functionality. for us, this would be awesome.
Context: We have a requirements document with requirements in it so a change to any requirement would generate a new version of the document as well, otherwise, the history of requirement doc would be wrong. ie. We version the requirement itself and the document and we need to have a history of changes to the document.
thanks,
Dean
ignore this, was trying to reply to
http://www.jboss.org/index.html?module=bb&op=viewtopic&p=4258674#4258674
and screwed up and accidentally did a new post. See
http://www.jboss.org/index.html?module=bb&op=viewtopic&p=4258674#4258674
instead.