1. Re: Supports JBPM6 UserTasks with Multiple Connections?
swiderski.maciej Jun 9, 2014 1:36 AM (in response to buenavida)yes, although it's not recommended and disabled by default due to it's uncontrolled behavior. Check BPMN2 spec about uncontrolled behavior and here you can find system property to enable it.
HTH
-
2. Re: Supports JBPM6 UserTasks with Multiple Connections?
buenavida Aug 28, 2014 10:02 AM (in response to swiderski.maciej)Is it possible to add a condition to an outgoing sequenceflow in jbpm6?
-
3. Re: Supports JBPM6 UserTasks with Multiple Connections?
swiderski.maciej Aug 29, 2014 1:58 AM (in response to buenavida)yes, it should be possible to set conditions on the sequence flows as per BPMN2 spec. Though I haven't tested that in designer nor eclipse bpmn2 plugin. If it does not (event though uncontrolled flow is enabled) please drop a jira for it.
HTH
-
4. Re: Supports JBPM6 UserTasks with Multiple Connections?
buenavida Sep 1, 2014 3:49 AM (in response to swiderski.maciej)Hi. I use the eclipse bpmn2 designer and there you can not enter a condition for a sequence flow. You can only enter a Name and a Documentation.
Id created a jira for this:
[JBPM-4441] Add condition to sequenceflow in eclipse bpmn2 editor - JBoss Issue Tracker