Hi,
Good Afternoon,
We have two databases
databasename1
|
|---------> TableName1
databasename2
|
|--------->TableName2
In existing system we have configured in HBM as below.
<class name="packagename.ClassName" table="databasename1.TableName1">
Now I want configuration in HBM with below.
<class name="packagename.ClassName" table="TableName1">
1. How it is possible with out specifying database name in hbm file?
2. After some days i may change TableName2 into databasename1 And TableName1 into databasename2, with out modifying the code, how it is possible?