Hi,
We are looking to perform the following upgrade and need some advice regarding migration from JBoss ESB to SwitchYard:
JBoss 4.2.1 --> WildFly 10
Seam 2.1.1 --> Seam 2.3.0.GA
RichFaces 3.3.2.SR1 --> RichFaces 4.x
JBoss Cache --> Infinispan
JBoss ESB 4.4.GA --> SwitchYard
As mention in this thread I started previously - "If you just remove jboss esb from equation it would be quite simple migration path,"
https://developer.jboss.org/message/948589#948589
So is it possible to remove the JBoss ESB migration to SwitchYard from the initial upgrade?
What are the available options?
Thanks