1 Reply Latest reply on Feb 1, 2005 7:40 PM by Amit Basu

    commit option A plus optimistic locking on read only operati

    Amit Basu Newbie

      I am using commit option A on entity beans, so that there is no redundant ejbLoad of entity beans between transactions. But this means for 2 concurrent transactions, even if they were read-only operations, one would be locked out till the other completed, since the global instance cache is pessimistically locked.

      How do I devise a strategy to let read-only transactions proceed simultaneously (not one after other) despite using commit option A ?